• Home
  • Company
    • About us
    • Introduction
    • Quality Policy
  • Products
    • ArquitexWind
    • ArquitexIndustry
    • ArquitexPlugs
  • TP Cover – Arquihat
  • References
  • News
  • Contact
  • English
    • Español
Wind industry temporary covers
    • Home
    • Company
      • About us
      • Introduction
      • Quality Policy
    • Products
      • ArquitexWind
      • ArquitexIndustry
      • ArquitexPlugs
    • TP Cover – Arquihat
    • References
    • News
    • Contact
    • English
      • Español
    Posted on 12/05/2023 at 14:18

    Arquitex manufactures and supplies Arquihat covers for the tower sections 1 and 2 of the Halliade X wind turbines on the wind farms of Vineyard, New Bedford, Massachusetts and Dogger Bank, UK. In addition, it performed in the named wind farms the training for the proper assembling of the Arquihat.

    See more: TP Cover – Arquihat

    montaje de la halliade x montaje de la halliade x en eeuu

    Share
    Recent Posts
    • Arquitex produces leveling jacks for containers
    • Arquitex develops and supplies blade root covers for Haliade-X wind turbines
    • Arquitex develops and supplies sun roofs for the Spanish Army
    • Arquitex develops a new product: water bag ballast (Arquiballast)
    • Arquitex supplies Arquihat covers for Vineyard and Dogger Bank wind farms

    © Copyrights 2019 Arquitex Technology, S.L.. All rights reserved.

    Polígono Malpica Calle F Oeste, Parcela 23, nave 3

    50016 Zaragoza ESPAÑA  ·  Tel. +34 976 463 476

    logos_proyecto_KIT DIGITAL
    • Home
    • Company
      • About us
      • Introduction
      • Quality Policy
    • Products
      • ArquitexWind
      • ArquitexIndustry
      • ArquitexPlugs
    • TP Cover – Arquihat
    • References
    • News
    • Contact
    • English
      • Español